
A green transition becomes more practical when it starts with company data rather than a catalogue of technologies. For an SME, the first question is not “which equipment should we buy?” but “where are our main consumption points, losses and risks, and what result do we want to measure?”.
Establish a baseline
Gather available bills and records for electricity, fuels, water, raw materials and waste. Where possible, break consumption down by workshop, production line or major use. A reference year then makes it possible to measure progress.
Identify priority areas
Rank the main sources of consumption and loss. Priorities may include energy efficiency, renewable energy, lower water consumption, waste recovery, better use of materials or the development of more eco-designed products.
Maroc PME’s TATWIR Croissance Verte program refers to energy-efficiency, renewable-energy, clean-technology, recycling and green-product projects. These areas provide useful guidance, but eligibility should always be checked against the official conditions in force when an application is prepared.
Turn the idea into a measurable objective
A solid project states the starting point, expected result and measurement method. Examples include reducing the electricity used by a process, lowering water use per unit produced, reducing material losses or increasing the proportion of waste recovered.
Estimate the full investment
Do not limit the budget to equipment cost. Include installation, studies, site adaptations, maintenance, staff training, monitoring and possible downtime. This prevents under-budgeted projects from becoming difficult to operate.
Check operational impact
A cleaner technology must remain compatible with product quality, lead times, production volumes and safety constraints. Before a major investment, a technical audit, test or pilot phase may be preferable to immediate full deployment.
Prepare evidence and indicators
Keep invoices, meter readings, measurements, technical plans, photographs and production data that demonstrate the baseline and expected impact. These records help internal management and any support program that requires evidence of projected gains.
Organize project governance
Appoint an internal owner even when external experts are involved. Define who approves technical choices, who monitors indicators, who controls expenditure and who reports results.
Recheck support schemes before applying
Maroc PME currently presents green-growth offers and, under PACTE TPME, support linked to decarbonisation and water. As eligibility, support rates, sectors and procedures can change, businesses should consult the official pages when preparing an application.
A well-prepared green transition links environmental performance to economic performance. The priority is to start from a measurable diagnosis, select the highest-value actions and track results over time.
No comments have been published yet.